<?xml version="1.0" encoding="UTF-8"?><rss
version="2.0"
xmlns:content="http://purl.org/rss/1.0/modules/content/"
xmlns:dc="http://purl.org/dc/elements/1.1/"
xmlns:atom="http://www.w3.org/2005/Atom"
xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
> <channel><title>Comments on: Cedar Point Hints for 2010</title> <atom:link href="http://parkthoughts.com/2009/08/31/cedar-point-hints-for-2010/feed/" rel="self" type="application/rss+xml" /><link>http://parkthoughts.com/2009/08/31/cedar-point-hints-for-2010/</link> <description>An Amusement Industry Blog giving opinions and reviews along with updates, news and rumors from Amusement Parks, Theme Parks, and Water Parks from around the world.</description> <lastBuildDate>Fri, 10 Feb 2012 06:02:00 +0000</lastBuildDate> <sy:updatePeriod>hourly</sy:updatePeriod> <sy:updateFrequency>1</sy:updateFrequency> <generator>http://wordpress.org/?v=3.3.1</generator> <item><title>By: Egypt2112</title><link>http://parkthoughts.com/2009/08/31/cedar-point-hints-for-2010/comment-page-1/#comment-255</link> <dc:creator>Egypt2112</dc:creator> <pubDate>Tue, 01 Sep 2009 20:59:11 +0000</pubDate> <guid
isPermaLink="false">http://parkthoughts.com/?p=1777#comment-255</guid> <description>Yep. It will be revealed on Thursday. I think it will be an Intamin aswell. Maybe a Tornado copy?</description> <content:encoded><![CDATA[<p>Yep. It will be revealed on Thursday. I think it will be an Intamin aswell. Maybe a Tornado copy?</p> ]]></content:encoded> </item> <item><title>By: Radicaldude108</title><link>http://parkthoughts.com/2009/08/31/cedar-point-hints-for-2010/comment-page-1/#comment-253</link> <dc:creator>Radicaldude108</dc:creator> <pubDate>Tue, 01 Sep 2009 19:06:30 +0000</pubDate> <guid
isPermaLink="false">http://parkthoughts.com/?p=1777#comment-253</guid> <description>I just saw this on their Twitter &quot;09.03.09 09:10. All will be revealed.&quot;</description> <content:encoded><![CDATA[<p>I just saw this on their Twitter &#8220;09.03.09 09:10. All will be revealed.&#8221;</p> ]]></content:encoded> </item> <item><title>By: jaffa</title><link>http://parkthoughts.com/2009/08/31/cedar-point-hints-for-2010/comment-page-1/#comment-249</link> <dc:creator>jaffa</dc:creator> <pubDate>Tue, 01 Sep 2009 10:40:16 +0000</pubDate> <guid
isPermaLink="false">http://parkthoughts.com/?p=1777#comment-249</guid> <description>i think it will not be a vekoma and defo an intamin.I think that Cedar Fair has a contract with Intamin and they have to have so many intamin coasters. Just what i think</description> <content:encoded><![CDATA[<p>i think it will not be a vekoma and defo an intamin.</p><p>I think that Cedar Fair has a contract with Intamin and they have to have so many intamin coasters. Just what i think</p> ]]></content:encoded> </item> <item><title>By: FlowJo</title><link>http://parkthoughts.com/2009/08/31/cedar-point-hints-for-2010/comment-page-1/#comment-245</link> <dc:creator>FlowJo</dc:creator> <pubDate>Mon, 31 Aug 2009 15:00:19 +0000</pubDate> <guid
isPermaLink="false">http://parkthoughts.com/?p=1777#comment-245</guid> <description>I don&#039;t think it will be an Intamin coaster because the last four or five have been Intamin. On the other hand, an Intamin log flume would be very nice and a good replacement for the one they got rid of. I would love to see a GCI as the park is in need of a new woodie. Mean Streak is now too rough for me and Blue Streak is horrible and bone rattling. That would only leave Gemini which is fun but can get old. A GCI would be great but my guess is a log flume as CP does not have one and if I am right, Cedar Point still has one ride left in their contract with Intamin.</description> <content:encoded><![CDATA[<p>I don&#8217;t think it will be an Intamin coaster because the last four or five have been Intamin. On the other hand, an Intamin log flume would be very nice and a good replacement for the one they got rid of. I would love to see a GCI as the park is in need of a new woodie. Mean Streak is now too rough for me and Blue Streak is horrible and bone rattling. That would only leave Gemini which is fun but can get old. A GCI would be great but my guess is a log flume as CP does not have one and if I am right, Cedar Point still has one ride left in their contract with Intamin.</p> ]]></content:encoded> </item> </channel> </rss>
<!-- Performance optimized by W3 Total Cache. Learn more: http://www.w3-edge.com/wordpress-plugins/

Minified using memcached
Page Caching using apc (User agent is rejected)
Database Caching 3/11 queries in 0.004 seconds using apc
Object Caching 380/382 objects using memcached

Served from: parkthoughts.com @ 2012-02-12 23:07:33 -->
